• TM3 Airports I AGL Design I Manchester I Dubai I Hanoi

Socialise with Us

ALCMS / ILCMS CONTROL SYSTEMS

Remote ATC tower AGL

ALCMS & ILCMS CONSULTANCY

TM3 Airports is an leading international ALCMS and ILCMS consultancy. The list below is a summary of our control systems services, for expanded details click here:

  • ALCMS Control System Safety Cases.
  • Design, Technical Specification & Compliance Production Documentation.
  • Procurement, Tendering, Technical Evaluation, & Cost Analysis.
  • ALCMS Project & Phasing Programme.
  • Project Management.
  • System Transition / Integration / IP & Data.
  • FAT, System Training, Service Contract Support.
  • System Commissioning, Testing & System Handover.
  • Compliance Testing.
  • Compliance Inspection FAA, ICAO, EASA.
  • A-SMGCS Technical Compliance Audits.

AIRFIELD LIGHTING SYSTEMS

Airfield Lighting Follow the Green

AGL SYSTEMS CONSULTANCY

We have unrivaled expertise in airfield lighting systems design, agl audits and inspections, compliance and policy. For expanded information on our airfield lighting services click here: 

  • AGL Systems Compliance Audits – ICAO / EASA / FAA.
  • AGL Safety Case Production.
  • AGL System Design for CATI, CATII, CATIII Airports.
  • Substation Design & CCR Specification.
  • AGL Project Management.
  • Equipment Procurement, Tendering & Technical Evaluation.
  • Design & Production of Maintenance Schedules
  • CAA & ICAO Policy Standards.
  • Dedicated AGL Training Division (ATC).
  • ICAO & EASA Airfield Compliance Inspections.

TM3 AIRPORTS - 2016 - 2024 REFERENCES

TM3 Airports clients

CASE STUDY - DUBLIN AIRPORTS AUTHORITY - DAA

Dublin Airport 2017 – 2021

Position: AGLCMS / ILCMS Project Consultants

Phase 1: Feasibility Study & Future Strategy for the ALCMS

Phase 2: Implement AGLCMS System Roadmap

PHASE ONE

Project: Feasibility Study & Future Strategy for the ALCMS at Dublin Airport

OUR SCOPE:

Contracted by Dublin Airport Authority (daa) as the Principal Consultants to produce a roadmap for the development strategy of the Dublin Airport ALCMS to meet the requirements of current airfield developments including a new IAA Control Tower and the new Northern Parallel Runway. The strategy also had to include the future proofing of the system for possible future development to a higher level of A-SMGCS or a Follow-the-Green type system.

RESULT:

The outcome of the study was the preparation of a strategy document which is currently being implemented by daa. The road map was split into phases to coincide with developments taking place on the airfield such as the building of a New IAA ATC Control Tower and the construction of the Northern Parallel Runway both of which have significant impacts on the existing ALCMS structure.

The production of the strategic plan followed terms of reference outlined by daa, which included the further integration between IAA (Irish Airports Authority) systems such as the Electronic Flight Strip system (EFPS) and the existing A-SMGCS, to the AGL Control system to automatically switch the airfield stop bars.

PHASE TWO

Project: To Implement the AGLCMS / ILCMS System Roadmap

SCOPE:

The project includes for the preparation of documentation for separate contract lots to appoint two framework contractors to proceed with works as outlined in the Dublin Airport AGL Control and Monitoring System roadmap.

Contract Lot 1 is to upgrade the ALCMS and is split into 3 different phases:

Phase 1

Modifications to the ALCMS to allow the integration of the new IAA Control Tower into the Airfield Lighting Control and Monitoring system including integrating the existing A-SMGCS system and the new IRVR equipment.

Phase 2

Modifications to the ALCMS to allow the integration of the replacement airfield Substation T fitted with series communication controlled and monitored CCR’s.

Phase 3

Modifications to the ALCMS to allow the integration of the new substations associated with the new Northern Parallel Runway development.

Contract Lot 2

Design and implementation of an ILCMS system. Initially comprising a trial installation to be monitored and assessed over a period of time, the overall plan is to rollout the implementation of ILCMS as the ALCMS phases outlined above are executed.

 

 

View More Case Studies – Click Here

Airfield Lighting Case Study
Dublin Airport - AGLCMS
TM3 Airports
Dublin Airport Airfield Lighting
Airfield Ground Lighting
Airfield Lighting Dublin
Dublin Airfield Lighting

Next Generation Aviation Professionals

Airfield Ground Lighting Engineering
AGL Training
Jamaica Airport Airfield Lighting - NGAP

AGLCMS / ILCMS

Airfield Lighting Control Systems

AGL Design

Airfield Lighting Design

AGL Training

Airfield Lighting Training
ua-62648720-1