AIRPORT PROJECT REFERENCES

We have a highly experienced consultancy team that have worked on the AGL & Control System projects worldwide including those below.

Use the + button to read further detail or contact us for our capability statement.

Dublin Airport 2017 to 2021

AGLCMS, A-SMGCS, ILCMS >> Principal Consultants

Phase I, AGLCMS Feasibility study, future proofing and road map strategy for Dublin Airports new runway and control tower including the development of higher-level A-SMGCS and Follow-the-Green systems.

Phase II, ALCMS specification & system architecture design, framework agreements, procurement process & technical evaluation, FAT, new substation design and service contract agreements.

FULL CASE STUDY – Click Here

Knock Airport 2018 – 2020

Principal Consultant

The development of a future strategy for the refurbishment & upgrade of electrical infrastructure, AGL, AGLCMS & ATC CNS systems.

CASE STUDY CLICK HERE

airsight / Rome–Fiumicino International Airport – 2019

Audit Inspection

Contracted with airsight gmbh – EASA Compliance inspection and reporting of complete AGL & AGLCMS (ADB – AGLAS system)

Onsite delivery of specialist training courses for advanced AGL works including AGL Control Systems, Individual Lamp Control Systems (Safegate ASP), Ring of Red, Sea of Green and CCR’s.

www.airfieldtraining.com

Jacobs – Manchester Airport

TP Project Specification 2016 >> 2019

Design Consultant

Preparation of specification items for changes to the Siemens SIMATIC S7 AGL Control System controlling Individual Lamp Switches and future implementation of an ILCM system (AGLAS) roadmap to A- SMGCS system.

London City Airport – Sept 2016 to 2018

Engineering Consultant

To supervise the refurbishment of new CATI LED, CCR & AGLCMS upgrade including installation quality assurance inspections and technical assistance. Clerk of works role to check AGL Installation against Design and ensure a compliant working system.

Malta International Airport, 2016 to 2018

Project Engineer

AGLCMS & AGL Project Engineer for the implementation of a mid-life upgrade of the AGLCMS including design solutions, project management and on-site commissioning.

Heathrow Airport Control System Resilience Project – 2014 to 2016

Engineering Consultant 

  • Tender preparation including bid management and specification development including solution for Level 4 A- SMGCS system with a “follow the green” routing.
  • Assessment of ILCMS using Honeywell and ADB AGLAS equipment.

Dublin Airport Maintenance and Response Contract – 2014 to 2017

Eng. Consultant

  • Design, specification and implementation of modifications and upgrades to existing AGLCMS.

MAG >> Manchester Airport New ATC Control Tower – 2012 >>2014

Project Director

Implementation, management, and upgrade of the AGL & SMGCS Control System to provide additional operator platforms in the new ATC control tower.

Sydney International Airport, Australia – 2011 >> 3013

Project Director

Design & upgrade to the existing PC based AGL Control System (ALCMS) to allow for control and monitoring  of stop bars and microwave incursion sensors, including design of solution for Control System mods, AGL  Design for Stop bars, Project Management and Product Design.

TM3 AIRPORTS CLIENTS

AGL & Control System projects worldwide including those below.

  • Airfield Lighting Design Jamacia
  • Kenya Airports Authority
  • Hong Kong Airport AGLCMS
  • Dublin Airport
  • London City Airport Master Plan
  • Manchester Airport Group
  • LCY - Airfield Lighting Design
  • Bristol Airport
  • Kuwait Airport

CASE STUDY - DUBLIN AIRPORTS AUTHORITY

Dublin Airport 2017 – 2021

Position: AGLCMS / ILCMS Project Consultants

Phase 1: Feasibility Study & Future Strategy for the ALCMS

Phase 2: Implement AGLCMS System Roadmap

PHASE ONE

Project: Feasibility Study & Future Strategy for the ALCMS at Dublin Airport

OUR SCOPE:

Contracted by Dublin Airport Authority (daa) as the Principal Consultants to produce a roadmap for the development strategy of the Dublin Airport ALCMS to meet the requirements of current airfield developments including a new IAA Control Tower and the new Northern Parallel Runway. The strategy also had to include the future proofing of the system for possible future development to a higher level of A-SMGCS or a Follow-the-Green type system.

RESULT:

The outcome of the study was the preparation of a strategy document which is currently being implemented by daa. The road map was split into phases to coincide with developments taking place on the airfield such as the building of a New IAA ATC Control Tower and the construction of the Northern Parallel Runway both of which have significant impacts on the existing ALCMS structure.

The production of the strategic plan followed terms of reference outlined by daa, which included the further integration between IAA (Irish Airports Authority) systems such as the Electronic Flight Strip system (EFPS) and the existing A-SMGCS, to the AGL Control system to automatically switch the airfield stop bars.

PHASE TWO

Project: To Implement the AGLCMS / ILCMS System Roadmap

SCOPE:

The project includes for the preparation of documentation for separate contract lots to appoint two framework contractors to proceed with works as outlined in the Dublin Airport AGL Control and Monitoring System roadmap.

Contract Lot 1 is to upgrade the ALCMS and is split into 3 different phases:

Phase 1

Modifications to the ALCMS to allow the integration of the new IAA Control Tower into the Airfield Lighting Control and Monitoring system including integrating the existing A-SMGCS system and the new IRVR equipment.

Phase 2

Modifications to the ALCMS to allow the integration of the replacement airfield Substation T fitted with series communication controlled and monitored CCR’s.

Phase 3

Modifications to the ALCMS to allow the integration of the new substations associated with the new Northern Parallel Runway development.

Contract Lot 2

Design and implementation of an ILCMS system. Initially comprising a trial installation to be monitored and assessed over a period of time, the overall plan is to rollout the implementation of ILCMS as the ALCMS phases outlined above are executed.

Airfield Lighting Case Study
Dublin Airport - AGLCMS
TM3 Airports
Dublin Airport Airfield Lighting
Airfield Lighting Dublin
Airfield Ground Lighting
Dublin Airfield Lighting

AGL TRAINING AWARD

Airfield Lighting Design

In 2020, 2021, 2023 we won the Aviation & Aerospace Award for ‘Best AGL Training Specialists’. For further details and case studies of the development training programmes (CBTA – NGAP) that we have delivered contact: amy.johnson@airfieldtraining.com

AGL TRAINING REFERENCES

Since 2016 Airfield Training Company has delivered ONSITE airfield lighting training to airports, airside contractors and agl engineering maintenance teams.

  • Riga Airport – 2020
  • Manchester Airport Group – 2016, 2018, 2020
  • Kuwait Airport – 2019, 2020
  • Hong Kong Airports Authority – 2016, 2017, 2019
  • Manila Airports Authority – 2020
  • Evercon AGL Contractors – 2020
  • Toma Construction (Kuwait) – 2019, 2020
  • Bristol Airport – 2019, 2020
  • Dublin Airport – 2017, 2018, 2019, 2020
  • Kenyan Airports Authority – 2018, 2019
  • Rome (FCO) Airport – 2019
  • Jacobs – 2018, 2019
  • Jamaican Airports Authority – 2018
  • London City Airport – 2017, 2018
  • West Indies Islands Group – 2018
  • Mauritius Airports Authority – 2017
  • Lagan Airports – 2017
  • BAE Systems – 2017, 2018, 2019
  • Thales – 2016, 2019
  • RAF Lakenheath – 2016, 2017
  • RAF Akortiri – 2016
  • Clarke AGL Contractors – 2016
  • safegate (Helsinki) – 2016
  • Bournemouth Airport -2016
  • G&A Barnie Contractors – 2016, 2017, 2018
  • Interserve – 2016, 2018
  • HIAL (UK) – 2016, 2017
AGL Training Gallery
AGL Training
Airfield Lighting Systems
Bristol Airport Airfield Lighting
Jamaica Airport Airfield Lighting - NGAP
Kevin Armstrong
Mauritius Airport Lighting Maintenance Training
Airfield Ground Lighting Engineering
Airfield Lighting Training
Airfield Lighting Training
Airfield Lighting Training
Airfield Lighting Training

DETAILED CASE STUDIES

For further details and case studies of the development training programmes (CBTA – NGAP) that we have delivered contact: amy.johnson@airfieldtraining.com

MISSION STATEMENT

Our Mission is to Improve Safety & Efficiency of Airfield Lighting Systems through Higher Standards of Certified Training in a Cost-Effective Manner.

ONE

Airfield Lighting Control Systems

TWO

Airfield Lighting Design

THREE

Airfield Lighting Training
ua-62648720-1